Enter your measurements
Volume = length × width × thickness. Cement = volume × dosage. Sand and gravel use indicative factors of 0.5 and 0.8 m³ per m³; water uses a 0.5 water-to-cement ratio.
Indicative estimate. Does not replace an engineering study.
02 / EstimateConcrete volume
4 m³
Cement required
28 50 kg bags
Indicative sand
2 m³
Indicative gravel
3.2 m³
Indicative water
700 L
Indicative estimate. Does not replace an engineering study.
A useful number to share with your manager
Add a project name and copy a clear summary for your site manager, project lead or director.
The quantity is clear. What comes next?
Rochemère Systems connects your BOQ, purchasing, budget and actual costs in one project. Share this result with your team and explore a guided pilot.
Calculation reference
For 1 m³ at 350 kg/m³: 7 bags of 50 kg, excluding waste.
Worked example
Slab 5 × 4 × 0.20 m: 4 m³ and 28 bags of 50 kg at 350 kg/m³, without waste.
Things to check
Confirm dimensions on plans, prescribed dosage and waste. Aggregate and water quantities remain indicative.
| 250 kg/m³ | 5 × 50 kg |
|---|---|
| 300 kg/m³ | 6 × 50 kg |
| 350 kg/m³ | 7 × 50 kg |
| 400 kg/m³ | 8 × 50 kg |
Content reviewed on 04/10/2026
METHOD
An estimate you can verify
Geometric volume includes the selected waste allowance. Cement is rounded up to full bags. Aggregate and water figures are illustrative: real proportions depend on local materials, moisture and mix design.
Technical sourceFAQ
How many cement bags for 1 m³ at 350 kg/m³?
Seven 50 kg bags before waste. Required dosage comes from approved drawings or mix design.
Can this size a foundation?
No. It estimates quantities from already defined dimensions. It does not design reinforcement or verify structural safety.