Skip to main content
Rochemère

FREE SITE TOOLS

Construction payment statement (décompte) template and calculator

Calculate the net payable of an interim statement: period works, revision, penalties, VAT, retention and advance. Free Excel template included.

Free · No account · Instant result

Also available in:Françaisالعربية

Inputs

The retention rate is an editable example: use your contract’s rate.

Indicative calculation from your inputs. Check contract terms and applicable rules before use.

Net payable

DA 1,048,350.00

Gross amount of the period
DA 1,000,000.00
Price revision
DA 25,000.00
Late penalties
DA -10,000.00
Amount excl. tax
DA 1,015,000.00
VAT
DA 192,850.00
Amount incl. tax
DA 1,207,850.00
Retention
DA -59,500.00
Advance repayment
DA -100,000.00
Retention release
DA 0.00

The retention is calculated on the gross works of the period. This is not a statement certified by the client.

Excel décompte template

A one-sheet workbook with the décompte lines and formulas. The example uses the default calculation amounts; the blank template waits for your amounts.

A useful number to share with your manager

Add a project name and copy a clear summary for your site manager, project lead or director.

The quantity is clear. What comes next?

Rochemère Systems connects your BOQ, purchasing, budget and actual costs in one project. Share this result with your team and explore a guided pilot.

Calculation reference

An interim statement (décompte provisoire) turns an approved works situation into an amount to pay. It starts from the cumulative works, removes what was already certified, adds the price revision, removes penalties, applies VAT, then deducts the retention and the advance repayment.

Worked example

Cumulative 3,000,000 DZD, previous statements 2,000,000 DZD: gross 1,000,000 DZD. Revision +25,000, penalties −10,000: excl. tax 1,015,000 DZD; VAT 19% = 192,850; incl. tax 1,207,850. Retention 5% TTC of the gross = 59,500; advance 100,000 → net 1,048,350 DZD.

Things to check

Do not enter the period amount instead of the cumulative amount. Do not calculate the retention on an amount that already contains penalties. Check the retention base (HT or TTC) and the advance repayment schedule in the contract terms.

Content reviewed on 04/10/2026

METHOD

An estimate you can verify

The calculation follows the cover page of the Rochemère official situation. The gross amount is the cumulative works less the previous statements. The retention applies to the gross works of the period (excl. tax, or excl. tax plus VAT). Revision, penalties, advance and release are the amounts of the period. Amounts are rounded to the centime.

FAQ

What is the difference between a works situation and a décompte?

The situation measures the executed quantities and their value. The décompte starts from that value and gives the amount to pay after revision, penalties, VAT, retention and advance.

Does the Excel template contain the formulas?

Yes. The calculated lines (gross, excl. tax, VAT, incl. tax, retention, net) are formulas. You enter only the amounts of your contract.

More useful tools